Website Design Melbourne

Welcome to MaxMargin™

MAXIMISING YOUR PROJECT MARGINS

Download App

Maximising Profit

FOR CIVIL CONTRACTORS

Are you a civil contractor building roads, bulk earthworks or drainage? Do you want to know how much profit (or loss) your work crews are making everyday rather than at the end of the month (when it is too late to change the results)? Do you want daily productivity targets?

Then this app is for you!

We know first-hand the challenges in ensuring projects are managed on-time, on-budget and to quality requirements. Let us provide the tools to ensure managing your budget is the easiest of your challenges.

Watch the short instruction video

Quick and Easy

MaxMargin™ is quick and easy to use. In seconds the app will:

  • Measure daily profit (or loss) of each work crew in real-time

  • Provide productivity targets for each work crew

  • Upload and provide the tender build-up to the project team (coming in premium version)

Features That Matter

THE REASONS YOU’LL LOVE IT

SELECTION

Choose from a variety of pre-loaded work crew operations

ON-SITE CHANGES

Simply remove or add plant, labour, materials and subcontractors to reflect changes on site. Work crew minimum productivity targets are instantly updated to reflect the changes.

INSTANT AWARENESS

Enter actual production achieved at the end of the shift to measure an instant daily profit result

REPORTING

Exports a CSV file immediately to capture daily costs, revenue and profit

EASY TO USE

Takes just a few minutes to load and review data

ADVANCED

Supports multiple Activities for large sites, which can be exported in bulk

App Overview

Activity

This is where you manage your Activity (a work crew’s task), change the details to match the project.

Tap the resources category (Plant, Labour, Materials and Subcontractors) to add or edit your resources.

Tap the Break Even value for more details and reporting. The Break Even value is the minimum daily productivity target to break even for this task.

Download App
MaxMargin Activities Screen

Resources

For each Activity edit daily resources to build up your daily costs. These are in four categories, Plant, Labour, Materials and Subcontractors. You can add preconfigured resources (then adjust) or create a new one by clicking on <New empty Activity>

Download App
MaxMargin Resources Screen

Daily Totals

At the end of your shift enter the actual production achieved. The daily cost, daily revenue and daily profit (including as a percentage) will be instantly calculated. Export this as a report (premium version)

MaxMargin™ supports multiple Activities for large sites, which can be exported in bulk.

Your Activities are automatically saved from the previous day so if your work crews are undertaking the same task then it only takes seconds to update for new minimum daily targets.

Download App

MaxMargin™ App – 6 Easy Steps

INSTRUCTIONS

STEP 1

Click on Add in the Activities page and choose the Activity that best matches your work crews’ task. There are pavement, earthworks, and drainage operations preloaded. If you have MaxMargin™ premium version up to 20 of your Activities will be saved from the previous day.

STEP 2

Click on the Activity and set the Revenue Unit and Revenue Rate you are being paid from the Project’s Schedule of Rates.

STEP 3

Click on Plant, Labour Materials and Subcontractors and match these to your resources on site. Click on individual items to edit the rates and estimate the hours that will be charged for the day. Click on add to choose from additional preloaded resources.

STEP 4

Check the Break-Even value. This is the minimum daily production rate you must achieve otherwise you will lose money.

MaxMargin Daily Totals Screen

STEP 5

At the end of your shift, click on the View Daily Profit Button and enter the actual production your work crew achieved. This will instantly show you how much profit or loss your work crew made for the day. Tip If you want to provide your work crews a productivity target with 10% profit included enter an amount in Actual Production Achieved that will provide a profit of 10%. Use this as your Productivity Target instead of the Break-Even Target

STEP 6

To be 100% accurate with your costs, use your work crews timesheets to go back and re-enter the exact hours charged for plant, labour, materials and subcontractors. Then export a csv report (premium version only)

Useful Tips

If the Break Even amount is showing as a negative number then the costs are higher than the revenue and it is not possible to make money

Enter the Actual Production to set the Daily Profit or Loss % to between 10% to 20%. Use this as your Work Crews Production Target rather than the Break-even Target

Make sure you push “Save” when making changes to the resources

When entering Materials resources, the conversion factor must be correct. Some examples for pavement aggregate. The conversion from loose cubic metres (cost) to solid cubic metres (revenue) is 1.5. The conversion from tons to solid cubic metres is 2.4

Plant resource rates do not include labour. Machine operators and truck drivers need to be added under Labour resources.

Premium Version

Under our Premium Version you can save and edit up to 20 Activities and export csv reports. Keep an eye out for new features in premium plus out soon, including the ability to upload your tender

Download today for a FREE 7-day trial.

Get in touch with us to organize a demonstration